Rover 1 at a glance
The 2026 Scoping Study, in four numbers.
Value, scale and how long it runs. Rover 1 carries the full study: the base case against the upside case, production and cashflow, the Mineral Resource by category, and the cautionary statement that goes with a scoping study.
- Pre-tax NPV8
- A$1.07BAugust 2026 study
- Initial mine life
- 11 yrsFirst production 2030
- Steady-state rate
- 750 ktpaUp from 500 ktpa in the 2022 PFS
- Gold, average year
- 26,800 ozPlus copper, bismuth, cobalt, magnetite
Sources: “Updated 2026 Rover 1 Scoping Study Produces Outstanding Results”, ASX:CST, 28 August 2026 · Mineral Resource update, ASX:CST, 20 October 2025.